Return
to Submission Contents Page
Table 1 Wind Power Stations Constructed in
the UK 1991-98
|
| Year |
Number of
Installations |
Number of
Turbines |
IC (MW)
Installed Capacity |
Cumulative
Installed Capacity |
Cumulative Number of Turbines |
| 1991 |
1 |
10 |
4 |
4 |
10 |
| 1992 |
7 |
205 |
64.1 |
68.1 |
215 |
| 1993 |
11 |
148 |
54.9 |
123 |
363 |
| 1994 |
8 |
76 |
34.7 |
157.7 |
439 |
| 1995 |
5 |
71 |
35.1 |
192.8 |
510 |
| 1996 |
5 |
123 |
70.9 |
263.7 |
633 |
| 1997 |
9 |
101 |
53.9 |
317.6 |
734 |
| 1998 |
4 |
36 |
19.4 |
337 |
770 |
N.B.The above totals include single
turbine sites.
Data collated from published sources by Geoffrey Sinclair, Environment Information
Services, Glebe House, Martletwy, Narberth, Pembrokeshire SA67 8AS
tel: 01834 891331 |
| Return
to top of page |
Table 2 Wind Power Stations Constructed in Wales
( at
September 1999)
|
|
|
Turbines |
|
Turbine Size |
|
| |
Developer |
Date
Built |
kW |
No. |
IC
MW |
Hub |
Rotor |
Total |
Map
Grid Refs |
| Cemaes |
WEG |
1992 |
300 |
24 |
7.2 |
25 |
16.5 |
41.5 |
SH 866 068 |
| Rhydygroes |
Ecogen |
1992 |
300 |
24 |
7.2 |
30 |
15.5 |
45.5 |
SH 395 930 |
| Llandinam |
Ecogen |
1992 |
300 |
103 |
30.9 |
31 |
14.5 |
45.5 |
SO 038 837 |
| Llangwyryfon |
WEG |
1993 |
300 |
20 |
6.0 |
25 |
16.5 |
41.5 |
SN 621 696 |
| Taff Ely |
Perma
Energy |
1993 |
450 |
20 |
9.0 |
35 |
18.5 |
53.5 |
SS 978 862 |
| Bryn Titli |
NWP |
1994 |
450 |
22 |
9.9 |
30 |
18.5 |
48.5 |
SN 930 755 |
| Dyffryn Brodyn |
New World
Power |
1994 |
500 |
11 |
5.5 |
35 |
18.5 |
53.5 |
SN 219 268 |
| Trysglwyn |
NWP |
1996 |
400 |
14 |
5.6 |
25 |
18.5 |
43.5 |
SH 440 890 |
| Carno |
NWP |
1996 |
600 |
56 |
33.6 |
31.5 |
22.0 |
53.5 |
SN 915 960 |
| Ystumtuen |
Powergen |
1997 |
300 |
8 |
2.4 |
30 |
16.5 |
46.5 |
SN 725 805 |
Mynydd
Glandulas |
CAT/WEG |
1997 |
600 |
1 |
0.6 |
40 |
20.0 |
60.0 |
SH 766 037 |
| Llyn Alaw |
NWP |
1997 |
600 |
34 |
20.4 |
36.5 |
16.5 |
53.0 |
SH 365 875 |
| Mynydd Gorddu |
Trydan Gwynt
Cyfyngedig /
NWP |
1998 |
600
500 |
19 |
10.2 |
34
35 |
21.5
20.5 |
55.5
55.5 |
SN 667 860 |
| Hafotty Ucha |
Tegni |
1998 |
|
1 |
0.6 |
40 |
20.0 |
60.0 |
SN 935 455 |
| Wales |
357 |
149.1 |
|
Return to top of page |
Table
3 Output from
UK Windfarms-rolling yearly averages,
Sept 1997 to June 1998
|
|
|
England |
Northern Ireland |
Wales |
Scotland |
UK |
y/e
Sept
97 |
IC(mMW)
|
92 |
29 |
124 |
47 |
292 |
| Output (mMWhr) |
199 |
85 |
247 |
99 |
630 |
| Theoretical Max mWh |
803 |
252 |
1086 |
417 |
2558 |
| CF (%) |
25 |
34 |
23 |
24 |
25 |
y/e
Dec
97 |
IC(mMW) |
93 |
30 |
138 |
52 |
313 |
| Output (mMWhr) |
194 |
88 |
267 |
108 |
657 |
| Theoretical Max mWh |
815 |
263 |
1210 |
454 |
2742 |
| CF (%) |
24 |
33 |
22 |
24 |
24 |
y/e
Mar
98 |
IC(mMW) |
93 |
30 |
141 |
52 |
316 |
| Output (mMWhr) |
199 |
94 |
288 |
129 |
710 |
| Theoretical Max mWh |
816 |
263 |
1233 |
454 |
2766 |
| CF (%) |
24 |
36 |
23 |
28 |
26 |
y/e
Jun
98 |
IC(mMW) |
93 |
30 |
143 |
52 |
318 |
| Output (mMWhr) |
204 |
95 |
306 |
139 |
744 |
| Theoretical Max mWh |
818 |
263 |
1254 |
454 |
2789 |
| CF (%) |
25 |
36 |
24 |
31 |
27 |
Return to top of page
|